Home DSME MOL & DSME Succeed In Demonstration Test Of “Cryo-Powered Regas” System For FSRU

MOL & DSME Succeed In Demonstration Test Of “Cryo-Powered Regas” System For FSRU

0
MOL & DSME Succeed In Demonstration Test Of “Cryo-Powered Regas” System For FSRU

[ad_1]

3D Image of the Turbine Generator

Mitsui O.S.K. Lines, Ltd. (MOL) and Daewoo Shipbuilding & Marine Engineering Co., Ltd (DSME) have successfully carried out the demonstration test of the “Cryo-Powered Regas” System for FSRU (*1) at DSME’s Okpo shipyard.

The role of an FSRU is to regasify -160°C liquified natural gas (LNG) through heat exchange. In the past, LNG’s cold energy had not been utilized in FSRUs and was released. By installing the “Cryo-Powered Regas” System, such cold energy will be transferred to another heating medium, and the generated steam will be sent to a turbine to generate electricity, which results in reducing FSRU’s fuel consumption and CO2 emissions.

3D Image of the Turbine Generator

Image Credits: mol.co.jp

A small-scale version of the “Cryo-Powered Regas” system was built in DSME’s R&D premises. The turbine generator used in this system was designed and constructed by Mitsubishi Heavy Industries Marine Machinery & Equipment Co., Ltd. (head office: Nagasaki, Japan; President: Toshiaki Hori) specifically for the CPR System.

Through this test, MOL and DSME verified that the system could successfully generate electricity up to its rated capacity. The result of this demonstration test confirms that through the utilization of the “Cryo-Powered Regas” System, fuel consumption and CO2 emissions of new generation FSRUs can be reduced by 50% at maximum rated regas flow rate (*2) compared to conventional existing FSRUs.

Introducing fuel-efficient FSRUs with lower CO2 emission rates to the market is one of the initiatives “Enhancement of Energy-Saving Technologies” (Figure below) that MOL is pursuing towards the achievement of MOL Group Environmental Vision 2.1

initiatives to realize MOL vision

Image Credits: mol.co.jp

The “Cryo-Powered Regas” System is ready for implementation in actual FSRU projects. MOL is already in discussions with multiple potential users and is confident in further promoting this system.

(*1)
Floating Storage Regasification Unit. A floating facility for storing and regasifying LNG, which is then pressurized and piped ashore.

(*2)
Equivalent to 500 mmscfd (million standard cubic feet per day)

Reference: mol.co.jp

Report an Error

MOL & DSME Succeed In Demonstration Test Of “Cryo-Powered Regas” System For FSRU appeared first on Marine Insight – The Maritime Industry Guide

[ad_2]

This article has been posted as is from Source

LEAVE A REPLY

Please enter your comment!
Please enter your name here

actress jyothi orgymovs.info telugu aunty xvideos hinbi sax ganstavideos.com sexxx vdo مقاطع سكس امهات felltube.com افلام جنسية مترجمة عربى dasesaxe xxxhindiporn.net porn video 3gp xxxnew pinkpix.net bangladeshi blue flim
www com xxx vdeo tubepornfilm.mobi freshpornclips نيك حامد freesextube.org ام تتناك india sex live bigassporntrends.com hidi xxx com bukkake comics hentaiclan.com supergirl hentai comic سكس حفله muarab.net نيك من السباك
ng bahay pinoyteleseryelove.com deped laptop mallu actress hot video dirtygfs.net london sex video brawling go 112 hentaihug.com sister cleaire karla estrada children replayteleserye.com gagamit سكس ميا arabianporns.com شم طيز